Heat Tracing for Refrigeration Plants

INTAYE Technical Library · Jiangsu Intaye Electric Co., Ltd. · 2026-10-07

Industrial refrigeration plants using ammonia or CO2 have lines that must not freeze, must not lose temperature, and must not leak. Heat tracing there sits between process safety and mechanical integrity — and the refrigerant itself changes the design.

Where tracing is applied

Design points

1. Know which lines must NOT be heated

Refrigerant liquid lines must not be warmed — that changes subcooling and can affect the system. The engineering task is to sort lines into "must heat", "must not heat" and "must insulate only". Getting this wrong is worse than doing nothing.

2. Ammonia is hazardous

Ammonia areas are classified; equipment must be certified for the zone gas group, and any heat source near ammonia lines must be designed for the leak scenario.

3. Frost heave and floors

Cold-store floors need a heater grid to prevent frost heave; that is a different product from line tracing, usually a constant-wattage cable designed for the slab.

4. Defrost water

Defrost water lines freeze quickly. Trace and insulate them, and slope to drain.

5. Insulation dominates energy

Refrigeration plants run continuously; poorly insulated traced lines waste energy all year.

6. Controls and alarms

Freeze protection here is usually not critical-path, but defrost and door systems directly affect operation. Alarms should reach whoever runs the plant.

Checklist

ItemConfirm
Line classificationMust heat / must not heat / insulate only
RefrigerantAmmonia or CO2, pressure class, temperature range
Area classificationZone and gas group for ammonia areas
FloorsFrost heave protection design
CondensateDefrost water tracing and drainage
EnergyInsulation specification, operating hours
AlarmsDoor/defrost/line alarms to plant staff

Common mistakes

Refrigeration plant project?

Send the line list with refrigerant and temperature data. We separate "must heat" from "must not heat" before sizing.

Request a Quote
📞 in 📞

What buyers actually ask before ordering

Objections and questions repeat across markets. The five below come up in most first conversations, and answering them early shortens the cycle:

QuestionWhat the buyer really wants to know
"What is the price per metre?"Whether the total system cost fits the budget — cable is often a minor part of panel, accessories and installation.
"Can you deliver in two weeks?"Whether the project schedule is at risk; standard cable may be fast, but panels and certification take longer.
"Is it certified for our zone?"Whether the certificate covers their gas group and temperature class, not just "Ex".
"Can we use our existing panel?"Compatibility of voltage, breaker sizing, control philosophy and alarm wiring.
"Who supports it after handover?"Spare parts availability, warranty terms and local service.

Where the specification usually goes wrong

These are not commercial details — each one changes cable selection, panel design or certification scope, and therefore the price. A specification that answers them is faster to quote and cheaper to build.