Heat Tracing for Loading Arms and Tanker Terminals
Loading arms and tanker connections are the last few metres of a heated line — and the place where heat tracing usually fails first. Movement, weather, tight geometry and short operating windows make this one of the most demanding details in a project.
Why loading areas are difficult
- The arm moves: cable must follow without fatigue.
- Short lengths and small pipe volumes: heat loss dominates and freezing is fast.
- Weather exposure: wind, rain, snow and ice.
- Hazardous areas: vapours at the loading point often need certified equipment.
- Access: maintenance is done in a live terminal, often at night.
Design points
1. Flexible heating for moving parts
Use cable configurations and a fixing method that allows movement: loops, spring or elastic support, and a swivel or loop at the pivot. Rigid fixing will fatigue the cable within a season.
2. Separate the moving section from the fixed line
The fixed line is traced and insulated normally; the arm has its own heating and a junction point designed for movement. Do not run one continuous cable across the pivot without a proper loop.
3. Maintain temperature at the nozzle
The nozzle and the last metre before the tanker connection are critical: they are uninsulated in many designs and lose heat fastest. Insulated covers or short traced sections are often needed.
4. Hazardous area certification
Loading vapour zones are usually classified; cable, terminations, junction boxes and control must be certified for the zone and gas group. Flexible or moving terminations need particular care.
5. Control and alarms
Loading is intermittent: control may be manual for loading windows plus thermostatic protection always on. Alarms to the loading control room are recommended, because a frozen arm stops operations.
Scope checklist for a loading project
| Item | Confirm |
|---|---|
| Arm type and movement | Range of motion, pivot location |
| Product and temperature | Maintain temperature at nozzle |
| Fixed line | Length, insulation, existing tracing |
| Area classification | Zone, gas group, temperature class |
| Control | Manual / thermostat / plant system |
| Access | How maintenance will be done |
Common mistakes
- Continuing the fixed-line cable across the pivot with no loop.
- No insulation or cover on the nozzle and last metre.
- Certified cable but uncertified junction boxes at the arm.
- No alarm, so a failure is found when loading is blocked.
- Fixing designed for a fixed pipe, not for movement.
What to provide for a quotation
- Arm drawings and movement envelope
- Product, maintain temperature and flow
- Area classification drawing
- Fixed line layout and insulation
- Control interface requirements
Topic hub: Heat Tracing by Industry (Applications)
Loading arm project?
Send the arm drawings and area classification. We design flexible tracing with certified components for the loading point.
Request a Quote