Replacing an Old Heat Tracing System

INTAYE Technical Library · Jiangsu Intaye Electric Co., Ltd. · 2026-10-07

Many plants have heat tracing installed 15–25 years ago: constant wattage cable, mechanical thermostats, no monitoring. It worked once. Now circuits trip, thermostats are stuck, and spares are obsolete. This guide covers when to repair, when to replace, and how to replace it without repeating the old mistakes.

Signs the old system is at end of life

Repair or replace?

SituationTypical action
One or two faulty circuits, rest healthyRepair terminals or replace sections
Multiple circuits failing on the same linesReplace the tracing on those lines
Insulation and cladding at end of lifeReplace tracing together with insulation
No monitoring, failures recurringUpgrade controls to monitored circuits
Cable type obsoleteReplace with current equivalent; update drawings

What to change when replacing

1. Cable selection

Constant wattage was often chosen for fixed output. Today self-regulating cable is usually the better fit for freeze protection because it can be cut on site and limits overheating — but check the output at the design ambient before switching types.

2. Controls

Replace mechanical thermostats with electronic controllers and add circuit monitoring or alarms. This is the single biggest reliability improvement in most retrofits.

3. Protection

Check breaker and RCD ratings against the new cable and the actual circuit length; do not reuse protection sized for the old system without checking.

4. Documentation

New as-built drawings, circuit schedule and test records. Old drawings are usually wrong after 20 years of modifications.

Planning the replacement

Testing after replacement

Insulation resistance, continuity, earth continuity, operating current and functional tests per circuit, plus alarm tests. Compare with the design values and record everything for the next 20 years.

Common retrofit mistakes

System replacement?

Send the existing circuit list and a few photos. We assess repair versus replacement and propose the new design.

Request an Assessment
📞 in 📞

What buyers actually ask before ordering

Objections and questions repeat across markets. The five below come up in most first conversations, and answering them early shortens the cycle:

QuestionWhat the buyer really wants to know
"What is the price per metre?"Whether the total system cost fits the budget — cable is often a minor part of panel, accessories and installation.
"Can you deliver in two weeks?"Whether the project schedule is at risk; standard cable may be fast, but panels and certification take longer.
"Is it certified for our zone?"Whether the certificate covers their gas group and temperature class, not just "ATEX".
"Can we use our existing panel?"Compatibility of voltage, breaker sizing, control philosophy and alarm wiring.
"Who supports it after handover?"Spare parts availability, warranty terms and local service.

Where the specification usually goes wrong

These are not commercial details — each one changes cable selection, panel design or certification scope, and therefore the price. A specification that answers them is faster to quote and cheaper to build.